BREAKING

RDF Indah Kiat Serang Claimed to be Largest in Southeast Asia, Capacity 8,100 Tons per Day

AI TRANSLATION AI-Powered Smart Translation: Intelligently translated into English for international readers.
🇮🇩 View Original (Indonesian)
RDF Indah Kiat Serang Claimed to be Largest in Southeast Asia, Capacity 8,100 Tons per Day
ENERGY
Dok. Radar Banten
Wakli Menteri Koordinator Bidang Pangan Hanif Faisol Nurofiq berdialog saat melakukan kunjungan ke IKPP Serang

The Paper Industry Still Depends on Imported Raw Materials

Hanif said that paper waste in Indonesia has great economic potential, but has not been utilized optimally.

Indonesia has around 113 paper industries with raw material requirements reaching 14 million tons per year. Around 7 million tons of this need is met by virgin pulp originating from industrial forest plantations, while the rest relies on waste paper.

However, according to Hanif, around 60 to 70 percent of the need for used paper is still met through imports.

“In fact, we have quite abundant potential for paper and plastic waste,” he said.

Therefore, he encouraged the government and companies, including Indah Kiat, to build a waste collection and sorting system so that used paper and plastic from within the country can be absorbed as industrial raw materials.

Third Phase RDF Begins Operations

Director of IKPP Serang Heppy Moiras said that the RDF facility that Hanif reviewed was a third stage unit with a larger capacity than the previous facility.

The unit has been operating in stages and is currently capable of absorbing around 6,000 tons of waste per day.

Story Reading Flow Page 3 of 5
View All Pages
Previous
1 2 3 4 5
Next

What do you think about this reporting?

Leave a reader reaction to support this journalistic work:
PREVIOUS ARTICLE 45 Thousand Mangroves Restore 25 Hectares of Cangkir Island Coast NEXT ARTICLE 11 Indonesian Students Study Clean Energy at the Bengkok Bandung Hydroelectric Power Plant
Reader Discussion & Comments (0)

Share Your Thoughts Editorial Moderation Required

Comments are reviewed and verified by the editorial desk prior to publication.
No comments yet for this story. Be the first to share your thoughts!

More Related Stories

View All in ENERGY
1 month ago
1 month ago
3 weeks ago