BREAKING

PSEL Bogor Raya 1 Built with an Investment of IDR 2.8 Trillion, Processes 1,500 Tons of Waste per Day

AI TRANSLATION AI-Powered Smart Translation: Intelligently translated into English for international readers.
🇮🇩 View Original (Indonesian)
PSEL Bogor Raya 1 Built with an Investment of IDR 2.8 Trillion, Processes 1,500 Tons of Waste per Day
ENERGY
KLH/BPLH
Coordinating Minister for Food Zulkiefli Hasan and Minister for the Environment Moh Zumhur Hidayat together with a number of officials carried out the groundbreaking procession for the construction of the Bogor Raya 1 Waste to Electrical Energy (PSEL) Processing facility in Galuga Village, Cibungbulang District, Bogor Regency, Thursday (17/9/2026)

"We welcome various technologies. They don't have to be electricity, but can be pyrolysis, diesel, RDF, green coal, pelletizing like coal, and so on," said Jumhur.

This approach is considered important because the volume, composition of waste, land availability and financing capabilities of each region are different.

Sorting Waste from Home Remains Key

The presence of PSEL Bogor Raya 1 is expected to help reduce urban waste accumulation in the Bogor area and its surroundings. However, KLH/Environmental Management Agency (BPLH) reminded that solving the national waste problem cannot only rely on downstream processing facilities.

Efforts to reduce waste from the source still need to be strengthened through sorting household waste, activating waste banks, reusing items that are still suitable, and limiting single-use waste.

Community participation is the key so that high-tech processing facilities do not simply move the waste problem from the final processing site to the incineration facility.

Management from upstream to downstream is needed to build a cleaner, safer and more sustainable waste system.

Official Press Release: Kementerian Lingkungan Hidup/Badan Pengendalian Lingkungan Hidup

Artikel ini merupakan siaran pers resmi yang diterbitkan melalui Meja Redaksi GARIS BUMI. Materi telah melalui peninjauan editorial untuk kenyamanan dan kejelasan informasi bagi pembaca.

Story Reading Flow Page 4 of 4
View All Pages
Previous
1 2 3 4
Next

What do you think about this reporting?

Leave a reader reaction to support this journalistic work:
PREVIOUS ARTICLE National Forest and Forestry Hotspots Down, South Sumatra (Sumsel) Records 184 Spots and Riau Zero NEXT ARTICLE DIY's Young Generation Becomes Guardians of Merapi, Prepares Innovation to Face the Threat of Cold Lava
Reader Discussion & Comments (0)

Share Your Thoughts Editorial Moderation Required

Comments are reviewed and verified by the editorial desk prior to publication.
No comments yet for this story. Be the first to share your thoughts!

More Related Stories

View All in ENERGY
1 month ago
1 month ago
2 weeks ago